Google Links
Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
- Plan and prepare rig up, conduct pre-spud operations and rig down
- Access, interpret and apply rig up, conduct pre-spud operations and rig down documentation and ensure the work activity is compliant
- Obtain, read, interpret, clarify and confirm work requirements
- Identify, address and report potential hazards, risks and environmental issues and implement control measures
- the work activities
- to commencing, during, and on completion of work activities
- Carry out pre rig-up procedure inspections (by rig manager, operator and crew)
- Coordinate movement of load and sequence of installation and location
- Check equipment for damage and/or loss by moving contractor and report and BI
- Rig up to spud
- hole/subsea hole
- Prepare for pre-spud operations
- Conduct operations as per drilling program
- Rig down
- Conduct housekeeping activities
- Prepare for drilling of surface hole/subsea hole
Performance Evidence
Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:
locates and applies relevant documentation, policies and proceduresimplements the requirements, procedures and techniques for the safe, effective and efficient completion of rig up, pre-spud and rig down operations including:identifying, addressing and reporting potential hazards and riskscontrolling identified hazardschecking equipment for damage and/or loss by moving contractor and report and BIidentifying, addressing and reporting environmental issues works effectively with others to plan, prepare and conduct rig up, pre-spud and rig down operations to meet all required outcomes including:resolving coordination requirements with others at the site prior to commencing and during work activitiescarrying out pre rig-up procedure inspections (by rig manager, operator and crew) coordinating movement of load and sequence of installation and location in accordance with rig movement planpreparing for and organising work activities to meet all task requirementscommunicating clearly and concisely with others to receive and clarify work instructionsusing a range of communication techniques and aids to advise others of work activity and exclusion zones taking corrective actiondemonstrates completion of rig up, pre-spud and rig down operations that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:identifying potential rig-up problems checking drilling and hoist equipmentdetermining optimum circulating and penetration rates and checking deviationsreceiving and actioning authorisation to commence drillingidentifying potential rig-down operationscarrying out effective supervision of rig up, pre-spud and rig down operations that meets all required outcomes
Knowledge Evidence