  1. Plan and prepare rig up, conduct pre-spud operations and rig down
  2. Rig up to spud
  3. hole/subsea hole
  4. Prepare for pre-spud operations
  5. Conduct operations as per drilling program
  6. Rig down
  7. Conduct housekeeping activities
  8. Prepare for drilling of surface hole/subsea hole

Performance Evidence

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies relevant documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient completion of rig up, pre-spud and rig down operations including:

identifying, addressing and reporting potential hazards and risks

controlling identified hazards

checking equipment for damage and/or loss by moving contractor and report and BI

identifying, addressing and reporting environmental issues

works effectively with others to plan, prepare and conduct rig up, pre-spud and rig down operations to meet all required outcomes including:

resolving coordination requirements with others at the site prior to commencing and during work activities

carrying out pre rig-up procedure inspections (by rig manager, operator and crew)

coordinating movement of load and sequence of installation and location in accordance with rig movement plan

preparing for and organising work activities to meet all task requirements

communicating clearly and concisely with others to receive and clarify work instructions

using a range of communication techniques and aids to advise others of work activity and exclusion zones taking corrective action

demonstrates completion of rig up, pre-spud and rig down operations that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

identifying potential rig-up problems

checking drilling and hoist equipment

determining optimum circulating and penetration rates and checking deviations

receiving and actioning authorisation to commence drilling

identifying potential rig-down operations

carrying out effective supervision of rig up, pre-spud and rig down operations that meets all required outcomes


Knowledge Evidence

The candidate must demonstrate knowledge in applying the rig up, conduct pre-spud operations and rig down through:

accessing, interpreting and applying legislative, organization and site requirements and procedures for:

identifying and managing risks

identifying, addressing and reporting environmental issues

setting up work activity

site isolation, signage and erecting barriers

work health and safety

selecting and checking for faults, all plant, tools and equipment to carry out tasks

optimum circulating and penetration rates

carrying out work to specifications

applying effective techniques for applying rig up, pre-spud and rig down operations

applying standard working practices and procedures for rig up, pre-spud and rig down operations

troubleshoot during drilling program

carrying out calculations including:

quantities

up-hole velocity

specific gravity

volume

hydrostatic pressures