Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Plan and prepare
  2. Monitor mud pumps
  3. Maintain and repair mud pumps

Performance Evidence

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include that the candidate:

locates and applies applicable documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient operation of mud pumps including:

identifying, addressing and reporting potential hazards and risks

controlling identified hazards

identifying, addressing and reporting environmental issues

preparing written records and reports

rectifying and/or reporting faults and malfunctions

works effectively with others to undertake and complete the operation of mud pumps that meets all of the required outcomes including:

complying with written and verbal reporting requirements and procedures

communicating clearly and concisely with others to receive and clarify work instructions

communicating clearly and concisely with others to resolve coordination requirements prior to commencing and during work activities

demonstrates completion of the operation of mud pumps that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

recognising and reporting equipment malfunction or failure

working as directed by driller in timely and efficient manner

checking pumps visually and aurally

checking piston lubrication system

setting pop-off valve

checking pressure of suction and discharge dampeners

charging discharge damper with nitrogen

lubricating and checking oil levels in gear end of pump

replacing swabs, liners, valves, seats and wear plates of fluid end of pump

preparing replacement parts for fluid end

ensuring correct liners and swabs are in use

correctly aligning mud pump discharge valves