Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare and prepare for monitoring and maintaining furnace gas efficiency
  2. Maintain efficient operation of furnace gas plant and systems
  3. Control furnace gas emissions
  4. Maintain efficient operation of furnace air injection equipment
  5. Ensure supply of additives
  6. Maintain plant and equipment efficiency
  7. Shutdown plant and equipment
  8. Prepare and prepare for monitoring and maintaining furnace gas efficiency
  9. Maintain efficient operation of furnace gas plant and systems
  10. Control furnace gas emissions
  11. Maintain efficient operation of furnace air injection equipment
  12. Ensure supply of additives
  13. Maintain plant and equipment efficiency
  14. Shutdown plant and equipment

Performance Evidence

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies relevant legislation, documentation, policies and procedures

works effectively with others to undertake and complete the monitoring and maintenance of furnace gas efficiency that meets all of the required outcomes including:

complying with written and verbal reporting requirements and procedures

communicating clearly and concisely with others to receive and clarify work instructions and coordinate work activities

demonstrates completion of the monitoring and maintenance of furnace gas efficiency that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

completing plant and equipment pre-start and start-up activities

operating, monitoring and maintaining equipment

inspecting equipment

monitoring and maintenance of feed chutes

performing post shut down and isolation checks