Elements and Performance Criteria
- Plan and prepare for Shutdown dredge and operator maintenance
- Obtain, interpret and confirm work requirements
- Access, interpret and apply documentation required to shutdown dredge for operator maintenance
- Identify and address potential risks, hazards and environmental issues, and implement control measures according to workplace procedures
- Select and wear personal protective equipment appropriate for the work activities
- Obtain and interpret emergency procedures, and be prepared for emergency situations
- Raise and safely secure ladder above water
- Conduct retreat away from working face to safe location
- Flush out plant according to workplace procedures
- Adjust spuds and/or cable lengths to ensure dredge remains level on pond
- Disconnect main power supply to dredge and plant
- Move float line to new position ensuring enough slack is available for move
- Confirm ladder is above water and safely secured according to workplace procedures
- Check ladder at scheduled times
- Inspect swing sheave action to assess ladder swing performance
- Inspect cutter components and flush flow according to workplace procedures
- Communicate and coordinate activities with relevant personnel throughout the work activity
- Conduct operational maintenance
- Conduct housekeeping activities