Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Plan and prepare for wet filling
  2. Fill voids
  3. Drain and monitor fill
  4. Plan and prepare for wet filling
  5. Drain and monitor fill

Performance Evidence

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies relevant documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient completion of set installation including:

using appropriate dust suppression and extraction methods

works effectively with others to undertake and complete the conduct of wet filling activities that meets all of the required outcomes including:

communicating clearly and concisely with others to receive and clarify work instructions, and convey work progress

demonstrates completion of conducting of wet filling that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

conducting equipment pre-start checks and start up procedures

inspecting and assessing site conditions to determine if scaling is required

filling void in controlled manner according to characteristics of fill

inspecting bulk head for faults and defects

using at least two (2) of the following fill materials:

combination of wet and dry

paste

wet

monitoring the drainage system against engineering specifications

maintaining written and verbal reporting requirements and procedures