Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Plan for underground lifting
  2. Prepare for underground lifting
  3. Move loads
  4. Plan for underground lifting
  5. Prepare for underground lifting

Performance Evidence

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies relevant documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient conducting of underground lifting operations, including:

selecting and using the required tools and equipment

identify and label unserviceable equipment, materials and tools

demonstrates completion of the conduction of underground lifting operations that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

develop a preliminary lifting plan which includes a minimum of five (5) of the following:

confirmed details of underground lifting requirement

confirmed dimensions

site access and egress

suitability and availability of materials

tools and equipment

identification of potential hazards

probable control measures

identification of site coordination requirements

selecting and preparing appropriate anchors

identifying and confirming appropriate safe working loads and centre of gravity

directing the load using appropriate signals

connecting load to movement device

applying load movement procedures to ensure stability of the load

dismantle and remove or restore load shifting equipment