Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Plan and prepare for automatic winding operations
  2. Haul personnel
  3. Haul equipment materials
  4. Carry out winder inspections
  5. Conduct end-of-shift activities
  6. Plan and prepare for automatic winding operations
  7. Haul personnel
  8. Haul equipment materials
  9. Carry out winder inspections
  10. Conduct end-of-shift activities

Performance Evidence

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies relevant documentation, policies and procedures

demonstrates completion of the operation of automated winder that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

completing start-up and shutdown procedures

applying dust suppression and extraction methods

energising the system

completing personnel haulage operations using automated winder

completing equipment haulage operations using automated winder

monitor and manage cage and skip performance

isolate and inspect winder


Knowledge Evidence

The candidate must demonstrate knowledge in operating an automated winder through:

use hand and power tools

key areas of mining acts and regulations

winder types, systems and operations

shaft configuration and construction

shaft services and installations (pipes, cables, ladders etc)

identification of defects relevant to skip operations through inspection or observation

trip and fault procedures and abnormal conditions

communication system between cage and winder

equipment processes, technical capability and limitations

geological and technical data (basic)

isolation and permit-to-work systems and procedures/manufacturer’s specifications

primary and secondary ventilation/mine ventilation system

shaft installations

in-shaft communications equipment and practices