Elements and Performance Criteria
- Plan and prepare for site water table construction
- Access, interpret and apply site water table construction documentation and ensure the work activity is compliant
- Obtain, read, interpret, clarify and confirm work requirements
- Identify, obtain and implement traffic signage requirements
- Select and inspect required plant, tools and equipment and rectify or report any faults
- Identify and address potential risks, hazards and environmental issues, and implement control measures
- Select and wear personal protective equipment appropriate for work activities
- Install site drainage/ dewatering system
- Identify proposed permanent stormwater outlets from site plans and drawings
- Erect barricades around the excavation/ installation area
- Construct sumps and wells
- Install well points, spears or wick drains
- Place gravel and filter material in spears, sumps and wells to level above that of existing water table
- Install surface or submersible pumps in designated locations
- Connect suction hoses to sumps, wells, spears and pumps
- Fit pipes and hoses to well points, spears and pumps
- Establish stormwater treatment system
- Operate and maintain drainage and dewatering system
- Remove and restore area
- Clean up
- Plan and prepare for site water table construction
- Access, interpret and apply site water table construction documentation and ensure the work activity is compliant
- Obtain, read, interpret, clarify and confirm work requirements
- Identify, obtain and implement traffic signage requirements
- Select and inspect required plant, tools and equipment and rectify or report any faults
- Identify and address potential risks, hazards and environmental issues, and implement control measures
- Select and wear personal protective equipment appropriate for work activities
- Install site drainage/ dewatering system
- Identify proposed permanent stormwater outlets from site plans and drawings
- Erect barricades around the excavation/ installation area
- Construct sumps and wells
- Install well points, spears or wick drains
- Place gravel and filter material in spears, sumps and wells to level above that of existing water table
- Install surface or submersible pumps in designated locations
- Connect suction hoses to sumps, wells, spears and pumps
- Fit pipes and hoses to well points, spears and pumps
- Establish stormwater treatment system
- Operate and maintain drainage and dewatering system
- Remove and restore area