Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Plan and prepare for site water table construction
  2. Install site drainage/ dewatering system
  3. Establish stormwater treatment system
  4. Operate and maintain drainage and dewatering system
  5. Remove and restore area
  6. Clean up
  7. Plan and prepare for site water table construction
  8. Install site drainage/ dewatering system
  9. Establish stormwater treatment system
  10. Operate and maintain drainage and dewatering system
  11. Remove and restore area

Performance Evidence

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies relevant documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient completion of the control of a construction site water table including:

selecting and using the required tools and equipment

installing site drainage/dewatering system

establishing a stormwater treatment system

operating and maintaining drainage/dewatering systems

demonstrates completion of controlling construction site water table that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

installing a drainage/dewatering system that involves spearing

installing a drainage/dewatering system that requires the establishment and operation of a treatment system


Knowledge Evidence

The candidate must demonstrate knowledge in controlling construction site water tables through:

interpreting engineering drawings

accessing and applying project quality requirements

identifying, using and applying terminology, definitions and installation methods

identifying, assessing and addressing hazardous materials and situations

identifying and addressing environmental, erosion, sedimentation and waste disposal issues

identifying dewatering system equipment characteristics, technical capabilities and limitations

identifying and applying dewatering system operational, maintenance and basic diagnostic procedures

identifying and complying with site isolation and traffic control responsibilities

identifying and using civil construction terminology