Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Plan and prepare equipment
  2. Select handling equipment
  3. Handle tubulars and equipment
  4. Prepare and run drill pipe/tubing
  5. Assist in preparation and running of blow out prevention stack, riser and diverter package
  6. Examine and service drill floor equipment
  7. Maintain a high standard of rig housekeeping
  8. Assist in preparation and running of blow out prevention stack, riser and diverter package

Performance Evidence

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies relevant documentation, policies and procedures

works effectively with others to undertake and complete well servicing rig floor operations that meets all of the required outcomes including:

complying with written and verbal reporting requirements and procedures

communicating clearly and concisely with others to receive and clarify work instructions

communicating clearly and concisely with others to resolve coordination requirements throughout work activities

demonstrates completion of well servicing rig floor operations that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

correctly babbitting the wire line sockets where applicable for equipment in use

assisting in the preparation and running of blow out prevention (BOP) stack, riser and diverter package

prepares and runs the drill string:

well servicing rig floor operation

prepares and operates pipe handling equipment including:

checking and overhauling the rig tongs and slips

checking the chains and operating pipe spinner correctly

assisting in making a conventional drilling connection using correct procedures

applying the additional safety regulations in force whilst flow testing a well

assisting in rigging up the electro-logging sheave cable, and know the patterns and positions of its hanging points

working effectively with others to undertake and complete well servicing rig floor operations that meets all of the required outcomes


Knowledge Evidence

The candidate must demonstrate knowledge of the following when performing well servicing rig floor operations:

organisation and site requirements and procedures

rig safety and emergency procedures

safe practices when Well Loggers are handling explosives or radioactive materials company and statutory safety guidelines, procedures and practices

the characteristics of stored energy

equipment safe operating procedures

equipment condition and reporting mechanisms

the function of the triangular mark stamped just above the casing

the steps taken if the well kicks whilst running casing

various lubrication techniques

rig maintenance

thread types

torque values for differing thread types milling operations

conversion between metric and imperial

a range of numerical calculations and measurements including:

length

quantities

volumes

conversion rates

well control