Elements and Performance Criteria
- Determine the vessel's stress and stability for all stages of the voyage
- Stability calculations and weight distribution planning is conducted at a time, frequency and scope appropriate to the proposed nature of the voyage or operation
- Weight distribution is designed to maintain the vessel within acceptable stability and stress limits for all stages of the voyage
- Trim, draughts and list are adjusted as required to safely and efficiently progress all vessel operations
- Stability and stress monitoring is conducted in time and scope relevant to the nature and speed of vessel operations, and sufficient enough to ensure that stress and stability remain within acceptable limits at all times
- Action taken where weight distribution is compromising vessel safety, is prompt and designed to maximise safety
- Tests and checks using computer-based stability programs or other appropriate methods are conducted at a frequency and scope that conform to manufacturer's instructions