(continued)TDMMR707B PLAN AND SCHEDULE OPERATIONS ON VESSELS OF UNLIMITED PROPULSION POWER |
VARIABLE | SCOPE |
| |
b | Operational scheduling and planning methods may include the use of: | 1
| GANTT charts
|
2
| CPM/PERT network techniques
|
3
| Other project planning techniques
|
| |
c | Propulsion plant configurations may include:
| 1
| low speed, medium and high speed diesel propulsion
|
2
| stern tube bearing
|
3
| CPP
|
4
| direct drive shaft
|
5
| diesel electric
|
6
| steam turbine plant and boiler
|
7
| gas turbine
|
8
| reduction gears
|
9
| thrust blocks, detuners and shaft bearings |
| |
d | Types of engines, propulsion equipment and related auxiliary machinery may include:
| 1
| steam turbine, diesel, diesel electric and gas turbine propulsion systems and controls
|
2
| steering gear, stabilisers, bow thrusters, rudders
|
3
| fluid power systems and controls
|
4
| pumps and pumping systems
|
5
| auxiliary systems and controls, including
|
| i
| fresh and salt water cooling systems
|
| ii
| lubricating oil cooling systems
|
| iii
| fuel, oil, gas, coal systems and centrifuges
|
| iv
| air compressor and air starting systems
|
| v
| lubrication
|
| vi
| bilge and ballast system, oily water separator
|
| vii
| refrigeration and air-conditioning plant and equipment
|
| viii
| on-board air compressors and compressed air and control air systems
|
| ix
| waste management and pollution control systems as per the MARPOL Convention
|
| x
| fresh water evaporators reverse osmosis systems
|