Elements and Performance Criteria
- Prepare for load transfer
- Load characteristics are identified to determine any special handling or equipment requirements
- Location of load in yard and following transfer method is determined
- Pathway for load transfer is established consistent with workplace procedures noting obstacles and any particular safety precautions
- Working area is prepared in accordance with the national standards, safety codes, and site operating procedures
- Personal protective equipment and other safety equipment is assembled
- The Safe Working Load (SWL) or Working Load Limit (WLL) is calculated using formulae for the particular type of lifting equipment
- Lifting equipment is checked to determine safe working order for the transfer
- Unsafe equipment is reported to appropriate personnel
- Transfer cargo
- Complete transfer
- Securing arrangements are released from load ensuring no injury to personnel or damage to machinery or cargo
- Relevant documentation is completed including reporting of damaged cargo in accordance with workplace reporting requirements
- Equipment is returned to store and work area returned to normal working condition