Elements and Performance Criteria
- Carry out pre-start checks
- Allocation of motive power units is checked in conjunction with appropriate personnel
- Motive power unit to be inspected and prepared is located
- Completion of all maintenance activities is confirmed
- Checks for safety controls are conducted in accordance with organisational procedures
- Internal and external integrity checks are conducted in accordance with organisational procedures
- Fluid levels are checked and appropriate action is taken as required
- Start motive power unit
- Motive power unit is started in accordance with manufacturer instructions and/or organisational procedures, and faults are recognised, diagnosed, reported and recorded in appropriate records for follow-up
- Hazards are identified, risks are assessed and risk control measures are implemented
- For critical or serious equipment faults that cannot be readily rectified, motive power unit is shut down, faulty equipment is isolated and tagged, and problem is reported for rectification
- All instruments and gauges are observed, readings are interpreted to confirm effective air and electrical operation, and where a problem is indicated, action is taken to determine the cause and to rectify or report the situation
- Fluid levels are rechecked after starting and appropriate action is taken as required
- Pre-movement checks are carried out to ensure motive power unit is braking and powering effectively and is safe to move
- Complete documentation
- All required documentation concerning inspecting the motive power unit is completed and processed in accordance with organisational procedures and regulatory requirements
- Logbook and other maintenance records on the motive power unit are completed and processed in accordance with organisational procedures and regulatory requirements
- Position motive power unit
- Authority to move and position motive power unit is obtained and relevant personnel are advised of intention and procedures
- Relevant personnel are made aware that motive power unit is about to be moved in accordance with organisational procedures
- Motive power unit is operated in accordance with standard procedures and regulatory requirements, and within operating and operational constraints
- Motive power unit is positioned in accordance with operational requirements and directions
- Motive power unit performance is monitored during operation to confirm effective operation and/or to identify defects
- Equipment defects are identified, reported, rectified and recorded or relevant personnel are advised for assistance
- Relevant work health and safety (WHS)/occupational health and safety (OHS) and regulatory requirements are followed to ensure safety and to prevent injury and damage
- Relevant personnel are advised that the motive power unit is secured in the required position and is ready for service