Elements and Performance Criteria
- Prepare for work
- Works order including drawings, sketches and material lists is received/accessed, analysed and confirmed as required by site inspection
- Resources, including equipment and materials, are identified and obtained
- Liaison and communication issues with other personnel at the site are resolved
- Hazards are identified prior to commencing work
- Site safety requirements are observed
- Conduct site housekeeping functions
- Stores, materials and equipment are loaded/off-loaded safely and secured
- Site, including stores and materials, is laid out to plan
- Stores and materials are checked for serviceability, cleaned as required and prepared for use
- Minor earthwork maintenance is conducted
- Excess materials and refuse are disposed of/returned, as required by workplace procedures
- Apply pest and vegetation control measures
- Pest and vegetation control requirements are identified and appropriate control measure is selected in accordance with workplace procedures
- Chemical control agents are prepared in accordance with safety requirements and workplace procedures
- Pest control measures are applied, monitored and varied to maintain effectiveness
- Control measures are applied, and pests and vegetation are removed/neutralised
- Complete work
- Worksite is rehabilitated
- Work completion details are finalised and recorded/advised to appropriate personnel