Elements and Performance Criteria
- Determine job requirements
- Worksite is identified
- Hazards are identified, risks are assessed and control measures are implemented
- Obstructions are cleared from gangways/flangeways to ensure safe passage of trains
- Installation, replacement or repair method is selected in accordance with work requirements, rail industry standards and workplace procedures
- Plant, equipment and materials are prepared for work
- Install guard rail
- Existing rail is removed, as required, to enable fitting of new rail
- New or replacement guard rail is installed to required standards using suitable equipment and fastening system to restore functionality of guard rail
- Final job is checked for compliance to required standards to enable services to be restored safely
- Complete documentation
- Required documentation procedures and processes are confirmed
- Documentation is filled in legibly and proofread
- Documentation is processed in accordance with workplace procedures