Elements and Performance Criteria
- Obtain and confirm job instructions/work specifications
- Coordinate loading of gear and equipment
- Assess job requirements and work area
- Adequate site access and egress is identified
- Potential hazards are identified and appropriate elimination or control measures selected
- Weight and dimensions of load are estimated or confirmed in consultation with customer and relevant personnel to ensure job is within limits of crane capacity
- Site information is interpreted and requirements confirmed with site supervisor
- Area is assessed to ensure there is sufficient space to establish crane and conduct lift
- Need to move mobile crane is assessed and, where applicable, route to be travelled is planned to ensure crane traverses firm surfaces and slopes are avoided where possible
- Any concerns about the safety or feasibility of the lift are discussed with the customer and if not resolved, reported to supervisor
- Payment arrangements are confirmed with customer where required
- Customer requirements are anticipated and suggestions made which will maximise safety and efficiency and minimise inconvenience
- Design job plan
- The job plan is developed to include hazard prevention/control measures and safety procedures in line with applicable Australian Standards, codes of practice and equipment manufacturers specifications
- Cranes load chart is consulted and information on permissible loads, radii, weights, boom and jib configurations taken into account in planning the job
- The job plan takes into account job requirements and customer priorities, and workplace rules and procedures
- Job plan is discussed and confirmed with relevant personnel
- Job plan details are documented as required
- Set up work area
- Site personnel and public are advised of any danger and site/work area is isolated as necessary in line with legislative, regulatory and customer requirements
- Site safety procedures are followed
- Required protective equipment is identified and fitted in accordance with manufacturers guidelines and customer requirements
- Ancillary equipment is assembled and erected where appropriate
- Load destination and travel route where applicable are prepared to accept load