Elements and Performance Criteria
- Prepare for train roll-by inspection
- Documentation and other relevant reports are read and clarified as required to confirm inspection requirements
- Individual responsibilities required to complete roll-by inspection are agreed with relevant personnel as required
- Hazards are identified, risks are assessed and risk control measures are implemented
- Position is taken for roll-by inspection at planned time to ensure complete observation without personal risk
- Conditions are assessed and necessary actions are taken to ensure roll-by inspection is effective
- Conduct a roll-by inspection of a moving train
- Train identification and status is confirmed
- Train hazards are identified, risks are assessed and risk control measures are implemented
- Condition of rolling stock and load are systematically observed as train passes and specific faults are identified and noted
- Communication is maintained with relevant personnel to ensure safe, efficient and complete roll-by inspection
- Inspection is conducted in accordance with work health and safety (WHS)/occupational health and safety (OHS) workplace policies and procedures to prevent injury and damage
- Faults requiring urgent action are noted and appropriate action is taken to initiate immediate response to minimise risk from continued movement of train
- Report and action roll-by inspection results
- Reports of inspections are completed to reflect inspection results
- Appropriate personnel are informed of faults or defects requiring rectification
- Records are circulated and filed in accordance with workplace policies and procedures
- Report on-train roll-by inspection results
- Outcomes of on-train roll-by inspections are transmitted to appropriate personnel
- Records of on-train roll-by inspections are made in accordance with workplace policies and procedures