Elements and Performance Criteria
- Plan and prepare electric tram
- Roster is checked and interpreted for day’s tram driving activities
- Allocation of electric trams is checked in conjunction with tram controllers and roster clerk
- Electric tram inspection and preparation duties are identified and interpreted
- Tram schedules, notices and other operational and regulatory documentation are accessed and interpreted in accordance with workplace procedures
- Communications equipment required for the day’s operations is obtained and checked to ensure it is functional
- Hazards are identified, risks are assessed and risk control measures are implemented
- Required personal protective equipment is obtained for use prior to tram driving activities
- Electric tram to be inspected and prepared is located in the depot
- Depot safety and basic electrical equipment awareness procedures are followed while locating tram in the depot
- Visually inspect and prepare electric tram
- Features, functions and location of electric tram and associated equipment are identified
- Logbook is checked to confirm serviceability of unit
- Pre-start internal and external safety and maintenance checks are conducted, in accordance with work health and safety (WHS)/occupational health and safety (OHS) and other workplace policies and procedures
- Electric tram and equipment are checked visually, and defects and deficiencies are recorded and rectified, isolated, tagged or reported as required, in accordance with workplace procedures and regulatory requirements
- Availability of traction power and sand are checked against journey requirements as required, in accordance with workplace procedures and regulatory requirements
- Relevant WHS/OHS and regulatory requirements are followed
- Documentation for electric tram inspection and preparation results is completed in accordance with workplace procedures
- Conduct ontram checks
- Electric tram is checked in correct sequence and all lights are confirmed as operating to optimum requirements
- Pre-departure mechanical checks are correctly performed and correct functioning of all equipment is confirmed in accordance with workplace procedures and manufacturer operating requirements
- Supervisory controls and indicators are checked to ensure they are functioning correctly and appropriate action is taken if they are not working correctly
- Communications equipment is checked to ensure it is functioning correctly and appropriate action is taken if it is not working correctly
- Seat, windows, blinds and other personal in-cab equipment are checked and adjusted for correct functionality, safety and comfort
- Ancillary equipment is checked and is confirmed to be operational in accordance with operating requirements
- Fire extinguisher, point bars and any other required tools are checked to confirm they are in position
- Start electric tram
- Electric tram is started in accordance with instructions and any operating faults are recognised, diagnosed, reported and recorded in appropriate records for follow-up
- Where critical or serious equipment faults cannot be readily rectified, electric tram is shut down and reported for rectification in accordance with procedures
- Instruments and gauges are observed and readings are interpreted to confirm effective operation
- Action is taken to determine cause of identified problem in instruments and gauges, and situation is rectified or reported, as required
- Sand operation is checked after starting and appropriate action is taken as required if not effectively functioning
- Pre-departure checks are carried out to ensure electric tram is braking and powering effectively and is safe to move
- Position electric tram
- Authority to move and position electric tram is obtained and relevant personnel are advised of intention and procedures
- Electric tram is positioned in accordance with operational requirements and directions
- Tram performance is monitored during operation to confirm effective operation or to identify defects
- Equipment defects are identified, rectified and recorded or relevant personnel are advised for assistance
- Relevant WHS/OHS and regulatory requirements are followed to ensure safety and to prevent injury and damage
- Relevant personnel are advised electric tram is secured in required position and is ready for service
- Required documentation concerning inspecting, preparing and starting up electric tram is completed and processed in accordance with workplace procedures