Elements and Performance Criteria
- Plan installation and maintenance
- Works order is analysed and confirmed as required by site inspection
- Resources required for the job are identified and scheduled in accordance with operational procedures
- Hazards are identified, risks are assessed and control measures are implemented
- Switch equipment and transformer are transported to worksite
- Liaison and communication issues are resolved in accordance with organisational negotiation procedures
- Prepare the worksite
- Work plan and resources required are confirmed/checked at worksite
- Personnel participating in the activity, including plant operators and contractors, are fully briefed
- Road signs, barriers and warning devices are positioned to ensure a safe worksite
- Safeworking practices are observed on or about the running track/line
- Worksite is laid out in accordance with work plan to ensure minimum waste and rework
- Systems/circuits are isolated as required, proved safe to work on in accordance with works order, and electrical permits are received/accepted/returned as required
- Install switches and transformers
- Switch equipment, transformers and earthing systems are installed and connected
- Transformer is tested and voltage output is adjusted
- Visual inspection is carried out to confirm equipment/apparatus is in a safe condition to test and/or commission
- Commission is carried out in accordance with works order/plan
- Maintain switches and transformers
- Maintenance requirement is confirmed by detailed site diagnosis
- Maintenance, including removal, repair, replacement and reinstatement, is carried out in accordance with works order and the condition of equipment
- Complete work
- Worksite is rehabilitated
- Appropriate authority is notified on completion of work
- Records and documentation for updating system data are completed and processed