Elements and Performance Criteria
- Plan and prepare for tip truck operations
- Vehicle haulage documentation is accessed, interpreted and applied to ensure work activity is compliant
- Work requirements are obtained, confirmed and applied.
- Signage requirements are identified, obtained and implemented in accordance with project traffic management plan
- Appropriate vehicle, tools, equipment and personal protective equipment (PPE) are selected
- Tools, equipment and PPE are checked for serviceability and faults are rectified or reported
- Environmental protection requirements are identified, confirmed and applied in accordance with project environmental management plan
- Conduct tip truck pre-operational checks
- Drive tip truck
- Site operating hazards and risks are identified and managed, and safe operating techniques are applied
- Engine power is managed to ensure efficiency of truck movements, and to minimise strain on engine, drive line and gears
- Engine power is coordinated with gear selection to ensure smooth transition and operation within torque range
- Tip truck is operated in accordance with work instructions and manufacturer instructions
- Road/traffic conditions, traffic flow, distance, load and appropriate speed are monitored and considered to ensure safety of people, property, equipment, loads and facilities
- Vehicle is stopped smoothly, using engine retarder, gears and brakes
- Load, transport and tip materials
- Tip truck is positioned at load and discharge points with a minimum of manoeuvre
- Tip truck movements are carried out in a smooth and controlled manner including raising and lowering tray body
- Weight and distribution of load is assessed, and type of material and size of vehicle are considered to ensure it is within vehicle capacity
- Safety and security of load is maintained from loading site to discharge site, including load cover requirements
- Load is safely discharged in accordance with fill site conditions and work instructions
- Tip truck body is lowered, excess material is cleared and tray body is secured before leaving site
- Shut down and clean up