Elements and Performance Criteria
- Determine stabling location
- Contact is made with appropriate personnel to determine planned location for stabling train and/or motive power unit
- Location is identified and confirmed with appropriate personnel
- Directions from appropriate personnel are interpreted and followed
- Stable motive power unit
- Train is shunted and secured to prevent roll away in accordance with directions and workplace procedures
- Motive power unit is stabled as directed
- Motive power unit is secured to prevent roll away, in accordance with directions and workplace procedures
- Motive power unit is shut down in accordance with manufacturer instructions and workplace procedures
- Cab is secured in accordance with workplace procedures
- Derailers are set in place in accordance with workplace procedures as required
- Carry out post-operational checks
- Fuel and fluid levels are checked and required action is taken to replenish consumables
- Inspection is made of motive power unit in accordance with workplace procedures
- Identified faults and defects are fixed and/or reported and recorded in accordance with workplace procedures
- Faulty and defective equipment that presents a safety risk is isolated and tagged in accordance with workplace procedures and rail regulations
- Outcomes of post-operational checks are recorded in accordance with workplace procedures
- Equipment is returned and stowed in accordance with workplace requirements
- Required safeworking and post-operational documentation is completed in accordance with workplace procedures and rail regulations