Elements and Performance Criteria
- Determine berthing location
- Berth and shut down an electric tram
- Carry out post-operational checks
- Visual and other checks are made of tram as per workplace procedures
- Any identified faults and defects are fixed or reported and recorded as per workplace procedures
- Faulty and defective equipment that presents a safety risk is reported as per workplace procedures and relevant regulations
- Outcomes of post-operational checks are recorded as per workplace procedures
- Secure an electric tram
- Complete post-operational paperwork
- Timesheet or other work record is completed
- Roster is checked for future work allocation
- Issues and variations are discussed and resolved with roster clerk
- All required documentation is completed as per workplace procedures
- All equipment is returned and stowed as per workplace requirements
- Records of the electric tram are completed in accordance with workplace procedures and regulatory requirements