Elements and Performance Criteria
- Prepare to shunt rail vehicles
- Shunting instructions are interpreted and confirmed
- Location of rail vehicles and required movements are identified
- Hazards are identified, risks are assessed and risk control measures are implemented
- Allocated motive power unit is confirmed as appropriate for intended activities
- Shunt rail vehicles
- Points, levers, switches and signals are operated as required, in accordance with organisational policies and procedures to control rail vehicle movement
- Uniform line of sight and radio shunting commands are used in accordance with organisational policies, procedures and requirements
- Rail vehicles are positioned in accordance with operational requirements
- Relevant work health and safety (WHS)/occupational health and safety (OHS) requirements are followed to prevent injury and to avoid damage to equipment
- Defect/fault cards are checked and appropriate action is taken in accordance with organisational policies and procedures as required
- Rail vehicle movements are controlled to prevent damage of rail vehicles and loads/contents in accordance with organisational policies and procedures
- Couple, uncouple and secure rail vehicles
- Rail vehicles are positioned to meet coupling requirements in accordance with organisational policies and procedures
- Coupling systems are identified and applied appropriately to couple and/or uncouple rail vehicles in accordance with manufacturer and organisational requirements
- Handbrakes and other securing devices are applied/released and attached/removed in accordance with organisational policies and procedures