Elements and Performance Criteria
- Plan erection of temporary storage facility
- Plans, storage specifications, assembly details and erection sequence are obtained and examined for accuracy to meet intended storage requirements
- Engineering drawings, computations and instructions are obtained from qualified persons as required
- Local and state/territory authority approvals for storage facility construction are obtained
- Hazards are identified, risks are assessed and control measures are implemented
- Labour and equipment requirements for storage facility construction are organised and scheduled in accordance with erection sequence
- Erect temporary storage facility
- Foundations and earthworks for temporary storage are prepared in accordance with workplace instructions and specifications
- Structural and storage components are assembled and placed in accordance with workplace instructions and specifications
- Protective sheeting (floor and wall) is placed and sealed/sewn in accordance with workplace specifications
- Material is placed into temporary storage facility in accordance with specifications and site procedures
- Grain protection measures are implemented in accordance with workplace requirements
- Labour and equipment are coordinated for timely and efficient completion of work
- Dismantle temporary storage facility after out loading
- Procedures for dismantling temporary storage facility, including sequencing of processes, are confirmed with qualified personnel
- Labour and equipment requirements for dismantling temporary storage facility are organised and scheduled
- Material is removed from storage in accordance with workplace procedures
- Protective sheeting (floor and wall) is dismantled and folded for future use or disposed of, in accordance with workplace procedures
- Structural components are disassembled, transported and stacked in accordance with workplace instructions
- Labour and equipment are coordinated for timely and efficient completion of work