Elements and Performance Criteria
- Monitor status of current train area plan
- Actual train movements and associated activities are analysed to establish current situation
- Proposed train movements and associated activities are identified to establish status of area plan in accordance with workplace procedures and policies
- Circulars, telegrams and special train notices are checked for accuracy and adjustments made as required
- Operational management system information is reviewed against observed status and inconsistencies corrected
- Implement the daily working timetable
- Train movements are prioritised and directed in accordance with authorisations to ensure optimum and consistent running to timetable
- Relevant information is communicated to internal and external customers to minimise the effect of changes
- Planned train movements, circulars and special train notices are implemented using safeworking systems and requirements to ensure safety
- Control rail traffic movement
- Layout, characteristics and condition of track section of responsibility is assessed for its effect on train running
- Train movements are coordinated with other relevant personnel in accordance with safeworking systems and requirements and workplace policies and practices
- Surveillance and alarm systems are monitored to identify emergency situations
- Signalling system is operated to ensure track section of responsibility is open or closed to train pathways as required
- Signalling systems are operated and monitored to ensure safe movement of traffic
- Implement contingency plans for system faults and failures, and for planned events
- Contingency plan to suit the event or system failure or fault is identified and reviewed as necessary
- Resources to cover the contingency are deployed in coordination with relevant personnel
- Communications with event site are established
- Train plan is adjusted in accordance with safeworking systems and requirements and in coordination with relevant personnel to minimise interruptions and provide alternative services
- Arrangements are made to maintain communications with internal and external customers where possible
- Operational management system information is updated to reflect changes resulting from plan implementation
- Update traffic movement documentation