Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Plan work/task
  2. Prepare for work/task
  3. Perform work/task
  4. Working area is inspected and appropriate paths for operating the bridge or gantry crane and moving/placing load/s in work area are assessed and determined in accordance with workplace procedures
  5. Work area operating surface is assessed to determine the quality of ground suitability for operational gantry crane in accordance workplace procedures
  6. Bridge or gantry crane Rated Capacity (RC) and lifting gear Working Load Limit (WLL) are established for the load/s and work/task requirements in accordance with manufacturer specifications and workplace procedures
  7. Relevant hazard identification and risk elimination/control measures are applied and advised to relevant person/s in accordance with workplace procedures
  8. Traffic management plan implementation is confirmed and followed in accordance with workplace procedures
  9. Appropriate communication procedures are identified, tested with associated personnel in accordance workplace procedures
  10. All tasks are confirmed to ensure requirements for the relevant work area in accordance with workplace procedures
  11. Risk control measures for hazards identified are checked for implementation in accordance with the lift plan and safe work procedures
  12. Bridge or gantry crane is accessed safely in accordance with manufacturer specifications and safe work procedures
  13. Pre-start bridge or gantry crane checks are carried out and any damage and defects are reported, recorded and appropriate action is taken in accordance with safe work procedures and manufacturer specifications
  14. Bridge or gantry crane is set up and rigged correctly with any lifting gear as per lift plan in accordance with relevant manufacturer specifications including load chart/s and safe work procedures
  15. Operational checks are carried out and any damage and defects are reported, recorded and appropriate action is taken in accordance with manufacturer specifications and safe work procedures
  16. All controls are located, identified and tested in accordance with relevant manufacturer specifications and safe work procedures
  17. Crane logbook is inspected and is correct for the crane and type and required rectifications have been signed off in accordance with manufacturer requirements and safe work procedures
  18. Weather and work environment conditions are assessed to determine any impact on bridge or gantry crane operations in accordance with manufacturer requirements and safe work procedures
  19. Hook block is safely positioned over the load in accordance with safe work procedures and if crane is controlled from cabin following directions from associated personnel
  20. Lifting gear is connected to load and used safely in accordance with the lift plan and safe work procedures
  21. Test lift is carried out in accordance with dogging and safe work procedures
  22. Loads are transferred using relevant bridge or gantry crane movements and tag lines as required, in accordance with lift plan and safe work procedures
  23. Load and bridge or gantry crane movement is monitored constantly and operated safely in accordance with lift plan and safe work procedures
  24. All required communications signals are correctly interpreted and followed whilst crane is operated in accordance with safe work procedures
  25. Load is lowered and landed safely in accordance with lift plan and safe work procedures
  26. Lifting gear is disconnected from load and positioned safely and efficiently for next task in accordance with lift plan and safe work procedures
  27. Bridge or gantry crane lifting gear and associated equipment is stowed and secured in accordance with safe work procedures
  28. Relevant motion locks and brakes are applied as required in accordance with manufacturer specifications and safe work procedures
  29. Bridge or gantry crane is shut down and secured to prevent unauthorised access/use in accordance with safe work procedures
  30. Post operational bridge or gantry crane checks are carried out in accordance with safe work procedures and manufacturer specifications