Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Plan work
  2. Conduct routine checks
  3. Set up crane
  4. Transfer load
  5. Mobile load
  6. Shut down and secure crane

Performance Evidence

A person who demonstrates competency in this unit must provide evidence of safely operating a non-slewing mobile crane greater than 3 tonne capacity and satisfy all of the elements, performance criteria and foundation skills requirements of the unit on at least one occasion including:

applying appropriate mathematical procedures to estimate loads

applying best mobile practice including:

carrying load near to the ground surface

gently accelerating and braking (to minimise load swing)

minimum boom/jib length

minimum speed

using handheld taglines

applying hazard prevention/control measures including:

adequate illumination

disconnected power

insulated electric lines

movement of obstructions

pedestrian barricades

personal protective equipment

safety tags on electrical switches/isolators

using safety observer inside exclusion zone

traffic barricades and control

trench covers

applying risk assessment and hazard control strategies, including hierarchy of control as applied to the positioning and safe operation of the crane

applying risk assessment and management procedures

assessing ground conditions to confirm site is suitable (e.g. firm, level and safe) to operate crane

communicating with other workplace personnel through:

appropriate worksite protocols

bells

buzzers

listening

making and interpreting hand signals

questioning to confirm understanding

signage

two-way radios

verbal and non-verbal language

written instructions

completing the pre-operational check, positioning, stabilising, set up, operation, post-operational checks of a mobile crane including all functions to their maximum extension in the lifting and moving of loads to the safe working rated capacity of a non-slewing mobile crane greater than 3 tonnes capacity in conjunction with other relevant personnel

complying with work health and safety WHS/OHS licensing legislation

operating a non-slewing mobile crane greater than 3 tonnes capacity including all functions to their maximum extension in lifting and moving loads to the safe working rated capacity in conjunction with other relevant personnel while applying crane movements including:

telescope in and out

boom/jib up and down

articulating as required

raising and lowering hoist as required

receiving and interpreting workplace instructions, safety information, emergency procedures

recording and maintaining accurate information relating to crane operations

shutting down a non-slewing mobile crane greater than 3 tonnes capacity in accordance with manufacturer specifications and workplace procedures including:

idling engine to stabilise temperature

retracting boom/jib/fly as required

retracting hoist rope and hook block

retracting outriggers/stabilisers as required

turning off engine

stabilising a non-slewing mobile crane greater than 3 tonnes capacity by:

correctly positioning plates or packing

deploying outriggers

establishing correct size plates or packing

test-lifting load just clear of lifting plane to ensure:

adjustments to slinging can be made in a safe manner

all crane equipment is functioning properly

load measuring equipment can be used to verify calculated weight of load

loads of unusual shape or weight distribution are correctly slung

near capacity loads do not overload crane

using and interpreting crane manufacturer specifications and data, including load charts, to enable crane to be configured for load including:

boom/jib

counterweights

fly-jib

using communication signals including:

stop – hand

stop – whistle

hoist up – hand

hoist up – whistle

hoist down – hand

hoist down – whistle

luff boom down – hand

luff boom down – whistle

luff boom up – hand

luff boom up – whistle

telescope out – hand

telescope out – whistle

telescope in – hand

telescope in – whistle

slew/articulate right – hand

slew/articulate right – whistle

slew/articulate left – hand

slew/articulate left – whistle

verifying problems and equipment faults, and applying appropriate response procedures to unplanned and/or unsafe situations including:

environmental conditions (e.g. wind, lightning, storms, etc.)

failure/loss of control (e.g. brakes and steering)

failure of equipment (e.g. hydraulic system)

obstacles and obstructions

unusual or difficult terrains.


Knowledge Evidence

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria and include knowledge of:

appropriate mathematical procedures for estimating and measuring loads

Australian and industry standards relevant to operating a non-slewing mobile crane (greater than 3 tonnes capacity)

Commonwealth, state or territory WHS/OHS legislation, standards and codes of practice relevant to the full range of processes for the crane class

ground suitability including:

backfilled ground

bitumen

concrete

hard compacted soil

rock

rough uneven ground

soft soils

hazards including:

environmental conditions (e.g. wind, lightning, storms, etc.)

ground stability (e.g. ground condition, recently filled trenches, slopes)

insufficient lighting

obstacles or obstruction

other specific hazards (e.g. dangerous materials)

overhead hazards (e.g. electric lines, service pipes)

traffic (e.g. pedestrians, vehicles, other plant)

unusual or difficult terrains

hierarchy of hazard identification and control:

elimination

substitution

isolation

engineering controls

administrative controls

personal protective equipment (PPE)

non-slewing mobile crane greater than 3 tonnes capacity characteristics and capabilities to allow the configuration of the crane to suit the range of loads

organisational and workplace standards, requirements, policies and procedures for conducting operations for the crane class

procedures for recording, reporting and maintaining workplace records and information

rated capacity and working load limits (including using crane load charts)

risks associated with overhead electric lines/electrical cables, ground conditions, crane tipping and demolition sites, other vehicles and personnel

systematic process of eliminating or reducing risk to personnel and property through the application of controls

typical routine problems encountered operating crane and equipment, and adjustments required for correction.