Elements and Performance Criteria
- Plan work
- Potential workplace hazards are identified
- Hazard control measures are identified in consultation with appropriate personnel consistent with appropriate standards to ensure the safety of personnel and equipment
- The weight of the load is identified and estimated in consultation with associated personnel
- Crane is appropriate to the loads and workplace conditions
- Appropriate path for the movement of loads in the work area is determined
- Appropriate communicationmethods are identified with appropriate personnel
- Conduct routine checks
- Appropriate hazard prevention/control measures are applied to the work area according to procedures in consultation with associated personnel
- Crane is accessed in safe manner
- Crane is visually checked for any damage or defects
- All signage and labels are visible and legible according to the appropriate standard
- Routine pre-operational crane checks are carried out according to procedures
- 2.6 All controls are located and identified
- 2.7 Crane service logbook is checked for compliance
- Crane is started according to procedures and checked for any abnormal noises
- All crane safety devices are tested according to procedures
- Post-start operational checks are carried out according to procedures
- All communication equipment is checked for serviceability
- All damage and defects are reported and recorded according to procedures, and appropriate action is taken
- Transfer load
- Determine lifts are within the capacity of the crane in consultation with associated personnel
- Boom/jib and hoist block is positioned over load following directions from associated personnel
- Test liftis carried out to procedures
- Loads are transferred using all relevant crane movements according to procedures and appropriate standards
- All required communication signals are interpreted correctly according to procedures and the appropriate standard
- Crane is operated according to procedures
- Load movement is monitored constantly to ensure safety of personnel and load, and structural stability
- Unplanned and/or unsafe situations are responded to in line with procedures
- Mobile load
- Shut down and secure crane
- Crane is placed in weather vain mode according to procedures (where applicable)
- Relevant motion locks and brakes are applied (where applicable)
- Crane and equipment is secured correctly according to procedures and the appropriate standard
- Crane is shut down according to procedures
- Routine post-operational checks on crane are carried out according to procedures
- All damage and defects are reported and recorded according to procedures, and appropriate action is taken