Elements and Performance Criteria
- Plan work
- Conduct routine checks
- Service logbook for elevating work platform is checked for compliance
- Elevating work platform is visually checked for any defects or damage according to procedures
- Routine pre-operational checks are carried out according to procedures
- Safety equipment is inspected according to procedures
- Elevating work platform is accessed in a safe manner
- Fit safety equipment and secure to platform according to procedures
- All controls are located and identified
- Elevating work platform is started according to procedures
- All safety devices are identified and tested according to procedures
- Post-start operational checks are carried out according to procedures
- All communication equipment is checked (where applicable)
- All defects and damage are reported and recorded in according to procedures, and appropriate action is taken
- Set up elevating work platform
- Ground suitability is inspected and checked
- Elevating work platform is driven to or located at work area according to procedures (where applicable)
- Elevating work platform is positioned for work application and stability according to procedures
- Appropriate hazard prevention/control measures are applied to the work area according to procedures
- Work gear and tools are stowed and secured
- Operate elevating work platform
- Elevating work platform is operated using all relevant plant movements according to procedures and the appropriate standards
- Elevating work platform is mobiled using best mobile practice and appropriate procedures
- Elevated working platform operations are monitored constantly ensuring safety of personnel and stability
- Unplanned and/or unsafe situations are responded to in line with procedures
- Shut down and secure elevating work platform
- Elevating work platform is lowered and stowed according to procedures
- All relevant motion locks and brakes are applied (where applicable)
- Safety equipment is disconnected from platform
- Egress from elevated work platform is conducted according to procedures
- Outriggers/stabilisers are stowed and secured according to procedures (where applicable)
- Plates or packing are stowed and secured (where applicable)
- Elevating work platform is shut down according to procedures
- Routine post-operational checks are carried out according to procedures
- All defects and damage are reported and recorded according to procedures, and appropriate action is taken