Elements and Performance Criteria
- Plan and prepare for work
- Type of structure to be installed is identified and appropriate methods are planned in accordance with workplace procedures and specifications
- Hazards are identified, risks are assessed and control measures are implemented
- Structure and/or materials required for installation are identified, obtained and prepared in accordance with plans and specifications
- Assemble and install structural elements
- Excavation is conducted as required, in accordance with workplace standards, procedures and regulatory requirements
- Foundations are installed as required, in accordance with workplace procedures and specifications
- Components are assembled and installed using appropriate methods in accordance with specifications and/or plans
- Level/position of structure is adjusted to required standard to maintain correct track geometry/clearances
- Fasteners are installed and tightened in position using correct fastening method to ensure structural integrity
- Installed structure is checked against specified requirements and/or plans, and required adjustments are made
- Maintain structures
- Components requiring replacement are checked against standards and are measured for preparation of replacement components
- Materials required for job are identified and organised as required to enable appropriate replacement of components
- Replacement components are cut and shaped to required standard in accordance with workplace procedures
- Surfaces of components are treated using appropriate methods and materials as required
- Finalise work
- Site is cleaned up to remove unnecessary materials and is restored to environmentally sound and safe condition
- Work is executed and documentation is completed and processed as required in accordance with organisational procedures