Elements and Performance Criteria
- Plan installation
- Work requirements are determined to identify scope of work and resources required
- Hazards are identified, risks are assessed and control measures are implemented
- Type of overhead wiring structure required for job is identified and organised
- Prepare for installation
- Footings are prepared and excavated in accordance with rail industry standards and workplace procedures
- Formwork is installed in accordance with rail industry standards and workplace procedures
- Concrete reinforcing is installed in accordance with rail industry standards and workplace procedures
- Concrete is mixed and placed in accordance with rail industry standards and workplace procedures
- Hold down plates/bolts are placed into concrete to correct dimensions to enable fitting of overhead wiring structure
- Install components
- Components are assembled onto bridge section as required in preparation for installation
- Masts and other components are positioned and installed as required in accordance with accepted workplace procedures
- Fastening systems are installed in accordance with rail industry standards to ensure the integrity of the overhead wiring structure
- Complete documentation
- Required documentation procedures and processes are confirmed
- Documentation is filled in legibly and proofread
- Documentation is processed in accordance with workplace procedures