Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare for work
  2. Worksite is identified
  3. Hazards are identified, risks are assessed and control measures are implemented
  4. Installation, replacement or repair method is selected to meet work requirements in accordance with workplace procedures
  5. Plant, equipment and other materials are prepared for work
  6. Transoms are prepared in accordance with job requirements using correct methods, including dressing and protective coatings
  7. Install or replace transoms
  8. Unserviceable transoms are extracted as required, using manual or mechanical methods in accordance with workplace procedures
  9. New transom is installed using manual or mechanical methods in accordance with workplace standards and procedures
  10. Transom is suitably supported by appropriate methods in accordance with workplace standards and procedures
  11. Transom bolts are replaced or tightened as required
  12. Work is completed to meet track geometry requirements in accordance with workplace standards and procedures
  13. Work is checked for compliance with acceptance standards for spacing, skew and geometry
  14. Complete documentation
  15. Required documentation procedures and processes are confirmed
  16. Documentation is filled in legibly and proofread
  17. Documentation is processed in accordance with workplace procedures

Performance Evidence

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria on at least one occasion and include:

applying relevant workplace procedures

identifying job hazards and taking required action to minimise, control or eliminate identified hazards

identifying, selecting and using relevant tools and equipment

implementing prepared contingency plans

installing and replacing transoms on underbridges

interpreting and following operational instructions and following scheduled work processes

modifying activities depending on operational contingencies, risk situations and environments

monitoring work activities in terms of planned schedule

operating and adapting to differences in equipment in accordance with operating procedures

preparing for work by selecting appropriate methods, materials and equipment for a variety of situations

reading and interpreting relevant instructions, procedures, route information and signs

reporting and/or rectifying identified problems, faults or malfunctions, in accordance with workplace procedures

working systematically with required attention to detail without injury to self or others, or damage to goods or equipment.


Knowledge Evidence

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria and include knowledge of:

contents of relevant workplace technical manuals and instructions

emergency management plan

hazards that may exist when installing and replacing transoms, and ways of controlling the risks involved

problems that may occur when installing and replacing transoms, and action that can be taken to report or resolve these problems

relevant safety, work health and safety (WHS)/occupational health and safety (OHS) and environmental procedures and regulations

track structure and geometry requirements

transom condition and placement acceptance rail industry standards

types of tools and equipment that may be used when installing and replacing railway transoms, and their applications

workplace procedures for installing and replacing transoms.