Elements and Performance Criteria
- Prepare for work
- Worksite is identified
- Hazards are identified, risks are assessed and control measures are implemented
- Plant, equipment and materials are organised to meet the scope of the job and installation type
- Install or repair temporary support
- Foundation is prepared as required, in accordance with site requirements and specifications
- Component surfaces are treated with appropriate coating as required to prevent degradation of components
- Temporary support is installed in accordance with workplace standards and procedures
- Level and alignment is adjusted to running surface to ensure correct geometry and profile
- Temporary support is adjusted/readjusted and secured as required, to ensure full bearing is achieved for integrity and safety of structure
- Complete documentation
- Required documentation procedures and processes are confirmed
- Documentation is filled in legibly and proofread
- Documentation is processed in accordance with workplace procedures