Elements and Performance Criteria
- Install foundations
- Hazards are identified, risks are assessed and control measures are implemented
- Worksite is inspected and appropriate arrangements are made for safe access for heavy plant and equipment
- Foundations are poured/laid in the correct location, size and quality requirements in accordance with the work orders and job specifications
- Authorisation is confirmed as required to ensure safe train operations may continue
- Assemble components
- Components are correctly identified, prepared and laid out for assembly in accordance with work orders/assembly specifications
- Components are pre-assembled in the correct sequence and checked to ensure safe and efficient installation can commence
- Install and mount structures and housings
- Structures are positioned on foundations and checked for compliance to job specifications in preparation for securing
- Structures are secured and checked for compliance with safety requirements and job specifications
- Housings and other equipment/components are correctly positioned, installed and secured to comply with work orders and job specification requirements
- Housings and other equipment/components are secured to ensure correct orientation to track and to prevent unauthorised access
- Structures and housings are positioned to ensure they are clear of all other structures, obstructions and interference, including minimum structure gauge
- Equipment is locked and secured to maintain site safety and security