Elements and Performance Criteria
- Prepare to install turnouts
- Hazards are identified, risks are assessed and control measures are implemented
- Existing track work is removed from worksite
- Track bed is prepared for installation of points and crossings in accordance with workplace procedures
- Install turnouts
- New points and crossings are installed in accordance with specified design, manufacturer instructions and workplace procedures
- Dimensions, geometry, condition and operation are checked for compliance with rail industry standards in accordance with design, manufacturer instructions and workplace procedures
- Non compliances are repaired or replaced as required in accordance with workplace procedures
- Complete installation process
- Documentation is filled in legibly and proofread
- Documentation is completed in accordance with organisational procedures
- Appropriate personnel are informed that the installation has been completed, in accordance with organisational procedures