Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Place temporary speed restriction equipment
  2. Location, type and required speed of restriction to be placed is confirmed
  3. Hazards are identified, risks are assessed and control measures are implemented
  4. Relevant Network Control Officer is contacted and informed, in accordance with network owner’s policies and procedures
  5. Equipment is checked for availability and suitability to perform job in accordance with network owner’s policies and procedures
  6. TSR equipment is placed in accordance with network owner’s standards
  7. Relevant personnel are notified that TSR equipment has been placed
  8. Remove temporary speed restriction equipment
  9. Location, type and speed of restriction to be removed is confirmed
  10. Relevant Network Control Officer is contacted and informed as required, in accordance with network owner’s policies and procedures
  11. Equipment is removed from track, and secured and stowed appropriately
  12. Relevant personnel are notified that TSR equipment has been removed

Performance Evidence

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria on at least one occasion and include:

applying relevant safeworking system and workplace procedures in a suitable rail corridor context

communicating effectively with individuals and groups

identifying job hazards and taking required action to minimise, control or eliminate identified hazards

reading and interpreting Rail Infrastructure Manager procedures for placing and removing temporary speed restriction (TSR) equipment

using TSR equipment in accordance with required Rail Infrastructure Manager standards

working within the available timeframes for the work function and in accordance with workplace safeworking procedures.