Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Place temporary speed restriction equipment
  2. Remove temporary speed restriction equipment

Evidence Required

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria required knowledge and skills the range statement and the assessment guidelines for this Training Package

Critical aspects for assessment and evidence required to demonstrate competency in this unit

The evidence required to demonstrate competency in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria of this unit and include demonstration of applying

the underpinning knowledge and skills

relevant legislation and workplace procedures

other relevant aspects of the range statement

the timeframes typically expected for the work function and industrial environment

compliance with OHampS regulations and other regulatory requirements

Context of and specific resources for assessment

Performance is demonstrated in a suitable context

Resources for assessment include

a range of relevant exercises andor other simulated practical and knowledge assessments andor

access to an appropriate relevant location in the rail corridor

In both real and simulated environments access is required to

applicable documentation including procedures regulations and codes of practice

Method of assessment

Assessment of knowledge must be conducted through appropriate writtenoral tests

Practical assessment must occur

through activities in an appropriately simulated environment andor

in a rail corridor