Elements and Performance Criteria
- Place track protection signage
- Location advice for track protection signage is confirmed
- Hazards are identified, risks are assessed and control measures are implemented
- Relevant Network Control Officer is contacted and informed as required in accordance with network owner’s policies and procedures
- Equipment is checked for availability and suitability to perform job in accordance with network owner’s policies and procedures
- Equipment is placed in accordance with network owner’s rail industry standards
- Relevant personnel are notified that track protection signage has been placed
- Remove track protection signage
- Location advice for removal of track protection signage is confirmed
- Relevant Network Control Officer is contacted and informed, in accordance with network owner’s policies and procedures
- Equipment is removed from track, and secured and stowed appropriately
- Relevant personnel are notified that track protection signage has been removed