Elements and Performance Criteria
- Place permanent way stop boards
- Advice is confirmed as to the location where permanent way stop boards are to be placed
- Relevant network control personnel are contacted and informed as required in accordance with network owner’s policies and procedures
- Equipment is checked for availability and suitability to perform job in accordance with network owner’s policies and procedures
- Equipment is placed to network owner’s standards
- Relevant personnel are notified that the permanent way stop boards have been placed
- Remove permanent way stop boards
- Advice is confirmed as to the location of permanent way stop boards to be removed
- Relevant network control personnel are contacted and informed as required in accordance with network owner’s policies and procedures
- Equipment is removed from track, and secured and stowed appropriately
- Relevant personnel are notified that the permanent way stop boards have been removed