Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Use stand alone signalling control equipment
  2. Signalling/point control equipment is identified and confirmed with network control officer, as required
  3. Authority to operate signalling/point control equipment is obtained from network control officer
  4. Appropriate personal protective equipment (PPE) is worn in accordance with Rail Infrastructure Manager and organisational requirements
  5. Track environment is accessed safely in accordance with workplace procedures
  6. Changed local conditions are identified
  7. Stand alone signalling/point control equipment is operated safely in accordance with local instructions
  8. Route is set and confirmed as correct to facilitate safe rail vehicle movement
  9. Communication with network control officer is maintained using appropriate communications protocols and systems in accordance with workplace procedures
  10. Unsafe situations and/or emergencies are identified and appropriate action is taken in accordance with workplace procedures
  11. Restore stand alone signalling control equipment
  12. Network Control Officer is informed when rail vehicle/s are clear of fouling points
  13. Stand alone signalling/point control equipment is restored to correct position
  14. Restoration is confirmed with Network Control Officer
  15. Signalling/point control equipment is locked and secured as required, in accordance with workplace procedures
  16. Identified equipment faults are reported in accordance with workplace procedures

Performance Evidence

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria on at least one occasion and include:

applying relevant workplace procedures

communicating effectively with individuals and work groups

following workplace policies, procedures and protocols

identifying unsafe situations and emergencies

operating stand alone signalling/point control equipment in accordance with workplace procedures

restoring stand alone signalling/point control equipment in accordance with workplace procedures

using appropriate personal protective equipment (PPE) conforming to Rail Infrastructure Manager requirements.


Knowledge Evidence

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria and include knowledge of:

operational communications protocols and systems

Rail Infrastructure Manager policies, procedures and protocols for identified unsafe situations or emergencies within duty of care workplace role

Rail Infrastructure Manager rules and workplace procedures

rail terminology as defined by the applicable Rail Infrastructure Manager

recognition of points, signals and location features

relevant rail danger zones.