Elements and Performance Criteria
- Prepare to conduct inspection and testing
- WHS/OHS risk control measures for work preparation are followed
- Scope of apparatus functions and quality requirements are identified, obtained and applied
- Testing processes and workplace procedures are reviewed and testing equipment checked for correct operation and safety
- Apparatus inspection and testing is coordinated with others involved in the work to ensure work schedules are met and safety measures are followed
- Conduct apparatus testing
- Need to inspect, test or measure live work is determined in accordance with WHS/OHS and workplace procedures
- Apparatus is checked and isolated in accordance with WHS/OHS and workplace procedures
- Inspection and testing are conducted in accordance with relevant industry standards, principles and technology of electrical measurement
- Test results are interpreted within the scope of required functionality and quality
- Conduct apparatus inspection
- Apparatus is inspected for quality in accordance with workplace procedures and relevant industry standards
- Work is completed in acceptable timeframe, environment and workplace conditions
- Report on apparatus inspection and testing
- Report forms/data sheets on inspection and testing are completed