Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare maintenance requirements for energy sector
  2. WHS/OHS risk control measures and workplace procedures in preparation for the work are followed
  3. WHS/OHS and workplace procedures are developed for required practice skills, frequency and level of maintenance work
  4. Maintenance program is determined from plant performance specifications and in consultation with relevant person/s
  5. Relevant person/s is engaged to assess the risks with individual equipment failure
  6. Level and frequency of repair/replacement for maintenance work is identified following manufacturer instructions in accordance with WHS/OHS and relevant industry standards
  7. Systems to manage and record maintenance work are identified in accordance with workplace procedures and relevant industry standards
  8. Develop and implement maintenance program
  9. Workplace procedures for the maintenance program are developed and implemented in accordance with workplace schedule and relevant industry standards
  10. Workplace procedures for records to be maintained are developed and implemented in accordance with workplace schedule and relevant industry standards
  11. Maintenance program is documented in accordance with relevant industry standards and workplace procedures
  12. Evaluate maintenance program
  13. Maintenance schedule is reviewed and revised to maintain equipment to acceptable level in accordance with workplace procedures

Performance Evidence

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions on at least two separate occasions and include:

applying relevant work health and safety (WHS)/occupational health and safety (OHS) requirements, including:

using risk control measures

determining the maintenance program from specifications and relevant person/s

developing a maintenance record system

developing maintenance schedule implementation procedures

developing maintenance program and evaluation procedures

documenting the maintenance program

identifying the level and frequency of repair/replacement maintenance

preparing maintenance requirements.


Knowledge Evidence

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions and include knowledge of:

relevant equipment

relevant industry standards

relevant maintenance principles

relevant maintenance systems maintenance plan

relevant manufacturer specifications and operating instructions

relevant plant performance specifications

relevant review of maintenance plan

relevant job safety assessments or risk mitigation processes

relevant WHS/OHS legislated requirements

relevant workplace documentation, including:

periodic and sample inspection reports

relevant workplace quality, instructions, policies and procedures.