Elements and Performance Criteria
- Prepare to use drawings, diagrams, schedules and manuals
- Need for drawings, diagrams, schedules or manuals is determined from the nature of work to be undertaken
- Relevant drawings, diagrams, site plans and cable/connection schedules or manuals required for the work to be undertaken are determined and obtained in accordance with workplace procedures
- Use drawings, diagrams, schedules and manuals to obtain job information
- Dimensions are extracted from drawings and diagrams in accordance with workplace procedures for application to the work to be undertaken
- Location of equipment is determined from equipment cable/connection schedules and location diagrams
- Information relating to work to be undertaken is located and interpreted from relevant cable/connection manuals in accordance with workplace procedures
- Use drawings, diagrams, schedules and manuals to convey information and ideas
- Drawing conventions are used to neatly correct freehand original job drawing to show final 'as-installed' arrangement in accordance with workplace procedures
- Corrected drawings are forwarded to appropriate person/s in accordance with workplace procedures
- Comply with industry standards, codes of practice and specifications
- Format of industry standards and codes of practice that apply to relevant disciplines are reviewed and applied in accordance with workplace procedures
- Purpose, format and content of job specifications are reviewed and applied