Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Determine project scope
  2. Hazards are identified, risks are assessed and control measures are implemented
  3. Extent of the project is determined from design brief specifications, other relevant documentation and discussions with appropriate person/s
  4. Estimated completion date is determined from design brief specifications, other relevant documentation and discussions with appropriate person/s
  5. Project activities are planned to meet scheduled timeframes in consultation with relevant person/s
  6. Estimate electrotechnology project
  7. Materials, labour and other costs are determined from relevant workplace documentation
  8. Sources and availability of materials and human resources required for the electrotechnology project are determined in accordance with workplace procedures
  9. Estimates are checked and revised for accuracy in costing against job specifications in consultation with relevant person/s
  10. Unplanned events are responded to in accordance with workplace procedures
  11. Document and submit quotation
  12. Quotation is forwarded to relevant person/s within specified timeframe
  13. Quotation documentation is filed in accordance with workplace policies and procedures

Performance Evidence

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria on at least two separate occasions and include:

adjusting estimates

applying relevant work health and safety (WHS)/occupational health and safety (OHS) requirements

checking and documenting estimates

creating, documenting, forwarding and filing quotations

dealing with unplanned events/situations in accordance with workplace procedures in a manner that minimises risk to personnel and equipment

documenting and submitting quotations

estimating completion dates

estimating electrotechnology project material and labour costs

estimating electrotechnology projects for a competitive quotation/tender for which the value must exceed $AUD20,000

identifying risk control measures

planning extent of projects

sourcing materials and human resources

working within timeframes.


Knowledge Evidence

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria and include knowledge of:

contingency

costing

design brief and specifications

documents used in estimating and costing margins

material take-off methods, including a list of materials with quantities and types of material

money labour rates method of costing

life cycle costing analysis

project estimates, including quotations and adjustments

relevant job safety assessments or risk mitigation processes

relevant manufacturer specifications

relevant WHS/OHS legislated requirements

relevant workplace documentation

relevant workplace policies and procedures

resources to be quantified and costed

resource (labour, plant, equipment and materials).