Elements and Performance Criteria
- Prepare to install multiple operating systems on computers and a client server network
- Operating systems, devices, software and services required are determined from network performance specifications and in consultation with relevant person/s
- Network security policy is reviewed in accordance with network performance specifications and in consultation with relevant person/s
- Activities are planned in accordance with workplace procedures and security policies for timelines and in consultation with others involved
- Relevant person/s is consulted to ensure the work is coordinated effectively with others in accordance with workplace procedures
- Install and configure computer and network operating systems
- Network protocols are installed and configured to integrate computers with different operating systems in accordance with relevant industry standards and network performance specifications
- Security measures of the network are implemented in accordance with workplace procedures, relevant industry standards and network performance specifications
- Disaster recovery plan is tested in accordance with workplace procedures and security measures
- Methods for dealing with unplanned situations are selected in accordance with and workplace procedures
- Monitor and optimise computer and network performance
- Computer and server malfunctions are identified and rectified using techniques and solutions in accordance with workplace procedures and network performance specifications
- Computer and server operating system incremental updates and security patches are installed in accordance with workplace procedures and network performance specifications
- Methods for dealing with unplanned situations are selected in accordance with workplace procedures and security policies
- Quality checks of work outcomes are conducted in accordance with workplace procedures, network performance specifications and relevant industry standards
- Work is carried out efficiently without unnecessary waste of materials or damage to apparatus, the surrounding environment or services using sustainable energy practices
- Report integration and outcome of network monitoring activities
- Computer and network installation and monitoring records are maintained in accordance with workplace procedures