Elements and Performance Criteria
- Prepare to install and modify optical fibre cabling
- Installation and modification of wiring is prepared in consultation with others and sequenced appropriately
- Scope of work is determined from documentation and/or discussions with relevant person/s
- Advice is sought from relevant person/s to ensure work is coordinated effectively with others
- Material required for the installation work is obtained in accordance with workplace procedures and job requirements
- Tools, equipment and testing devices required for the installation work are obtained in accordance with workplace procedures and checked for correct operation and safety
- Preparatory work is checked to ensure no damage has occurred and is in accordance with workplace procedures and relevant industry standards
- Install and modify optical fibre cables
- Optical fibres are tested for optical continuity
- Cables are installed and modified with sufficient excess to affect terminations in accordance with manufacturer specifications, relevant industry standards and job requirements
- Methods for dealing with unplanned situations are discussed with relevant person/s for approval and documented in accordance with workplace procedures
- Unplanned situations are dealt with safely and with the approval of relevant person/s
- Quality checks of the installed wiring are conducted in accordance with workplace procedures
- Cable installation and modification is conducted without waste of materials, damage to apparatus, circuits or surrounding environment using sustainable energy practices
- Terminate optical fibre cables
- Cable termination work area and optical fibre cables are cleaned and safety measures implemented in accordance with WHS/OHS requirements and workplace procedures
- Cables are prepared for termination in accordance with manufacturer specifications and relevant industry standards
- Optical fibre connectors are fitted in accordance with manufacturer specifications and relevant industry standards
- Relevant methods are used to splice optical fibre cables in accordance with WHS/OHS requirements, manufacturer specifications and relevant industry standards
- Cable performance tests are conducted and results documented
- Causes of defects indicated by test results are identified and rectified
- Cable terminations are completed without waste of materials, damage to apparatus, circuits or surrounding environment using sustainable energy practices
- Document installation and modification and verify optical fibre cabling performance
- Worksite is cleaned and made safe in accordance with workplace procedures
- Final checks to the installed cabling are conducted in accordance with job requirements
- Documentation certifying system performance is issued to a relevant person/s