Elements and Performance Criteria
- Prepare to install and/or modify copper cabling
- Hazards are identified, risks are assessed and control measures are implemented
- Installation or modification of wiring is coordinated after consultation with relevant person/s affected by the work
- Nature and location of work is obtained from relevant person/s and/or documentation, diagrams, cable layout drawings and cable schedules to determine the scope and details of work to be undertaken
- Cable routes are planned in accordance with relevant regulations, constraints of the building structure, fire walls, cultural/heritage requirements and regulations
- Advice is sought from relevant person/s to ensure work is coordinated effectively with others
- Material required for the installation work is determined and obtained in accordance with workplace procedures and checked against job requirements
- Tools, equipment and testing devices required for the installation are obtained in accordance with workplace procedures and checked for correct operation and safety
- Preparatory work is checked to ensure compliance with regulations, workplace procedures, safety and job requirements
- Install or modify copper cables
- Cables are installed or modified with sufficient excess to affect terminations in accordance with manufacturer specifications, technical standards and job requirements
- Cable installation/modification is carried out without waste of materials or damage to apparatus, circuits or the surrounding environment and using sustainable energy practices
- Terminate copper cables
- Cable termination work area is cleaned and safety measures implemented
- Cables are prepared for termination in accordance with manufacturer specifications, technical standards and workplace procedures
- Surge suppression devices are fitted to cables with metallic components in accordance with manufacturer specifications, technical industry standards and workplace procedures
- Cable shields are earthed in accordance with manufacturer specifications, technical standards and workplace procedures
- Twist ratio of generic, structured metallic cables is maintained in accordance with manufacturer specifications and technical standards
- Twisted pair cables are terminated in accordance with manufacturer specifications, technical standards and workplace procedures
- Cable performance tests are conducted accurately and results documented in accordance with workplace procedures
- Cause of defects indicated by inspection and test results are identified and rectified in accordance with manufacturer specifications, technical industry standards and workplace procedures
- Regular quality checks of the installed wiring are undertaken in accordance with workplace procedures
- Cable terminations are carried out without waste of materials, damage to apparatus, circuits or the surrounding environment and using sustainable energy practices
- Verify and document copper cabling installation and performance
- Final checks are made to installed cabling to ensure it conforms to performance requirements and regulations
- Telecommunications cabling advice (TCA) forms are completed in accordance with workplace procedures and issued to relevant person/s
- Worksite is cleaned and made safe in accordance with workplace procedures