Elements and Performance Criteria
- Prepare to install audio/video components and systems
- WHS/OHS risk control measures are followed in preparation for the work
- Safety hazards which have not previously been identified are reported and advice on risk control measures are sought from the work supervisor
- Nature and location of the work is obtained from relevant person/s to determine the scope of work
- Instructions for coordinating work with others is obtained from relevant person/s and applied
- Materials required for the work are determined in accordance with workplace procedures
- Tools, equipment and testing devices required for work are obtained and checked for correct operation and safety
- Install audio/video components and systems
- Circuits/machines/plant are checked and isolated, as required, in accordance with WHS/OHS requirements and workplace procedures
- Audio/video components are installed in accordance with relevant industry standards and job specifications with sufficient excess to affect terminations
- Accessories are installed straight and square in required locations within acceptable tolerances
- Cables and conductors are terminated at accessories in accordance with manufacturer specifications and regulatory requirements
- Unplanned events are reported to relevant person/s in accordance with workplace procedures
- Installation is conducted efficiently without waste of materials, damage to apparatus, circuits or the surrounding environment applying sustainable energy practices
- Complete installation work and report
- Worksite is cleaned and made safe in accordance with workplace procedures
- Completion of installation is reported to relevant person/s in accordance with workplace procedures