Elements and Performance Criteria
- Prepare electronics and communications system
- WHS/OHS risk control measures and workplace procedures in preparation for the electronics work are followed
- Safety hazards that have not previously been identified are noted on job safety assessment, assessed and risk control measures implemented
- Appropriate person/s is consulted to ensure the electronics work is coordinated effectively with others involved on the worksite
- System operating parameters are identified by reviewing system specifications and component technical data
- Tools, equipment and testing devices needed for the electronics work are obtained in accordance with workplace procedures and checked for correct operation and safety
- Preparatory work is checked to ensure no unnecessary damage has occurred and complies with requirements
- Circuits are checked and isolated in accordance with WHS/OHS requirements and workplace procedures
- Commission electronics and communications system
- Testing/measuring devices are connected and set up in accordance with job requirements for the communication system
- Measurements and adjustments are made to electronics and communications equipment to provide optimum system performance in accordance with system specifications and/or regulatory requirements
- Unplanned situations are responded to in accordance with workplace procedures in a manner that minimises risk to personnel and equipment
- Methods for dealing with unexpected situations are selected on the basis of safety and specified work outcomes
- System commissioning workplace procedures are performed in accordance with job requirements and industry standards
- Commissioning is carried out efficiently without unnecessary waste of materials or damage to electronic apparatus, the surrounding environment or services using sustainable energy principles
- Complete and report commissioning activities
- Adjustment settings are documented in accordance with workplace procedures
- Worksite is cleaned and made safe in accordance with workplace procedures
- Commissioning results and work completion are communicated to appropriate person/s in accordance with established procedures