Google Links
Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
Range Statement
Performance Evidence
Knowledge Evidence
Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions and include knowledge of: |
commissioning planning and documentationcommissioning process for commercial fire protection systeminitial inspection, tests and adjustments requirements, including industry standardsinput devices, including conventional, analogue or analogue addressable fire detectors, flow switch connections or switch connectionsinterface communication devices can be warden in communication phones and remote public address (PA) inputsoutput devices, including shutdown signal, door or system release controls and solenoid valve controlspurpose of commissioningrelevant manufacturer specificationsrelevant safe work method statements (SWMS)/job safety assessments or risk mitigation processesrelevant WHS/OHS legislated requirementsrelevant workplace documentationrelevant workplace policies and procedures, including fire protection system commissioning proceduressystem interface controls, including communication signals to remote control and indicating equipment, building monitoring systems, paging system and colour graphics warning indicators, including flashing lights for hearing impaired persons and fire brigade building indication. |